HORIZONTAL AUGER BORING GUIDED
This is the best and cheapest alternative to Microtunneling.
Driving of a conduit. The continuous soil digging happens via auger and the installation of the pipe happens via boring machine.
It is possible until DN 800mm with soil classes between 3 – 5 and stones.
It is possible until DN 500mm with soil classes between 6 – 7 (possible with Down-The-Hole Hammer)
Guided until DN 600mm
Phase 1: Controlled drilling of a pilot hole with optical electronic navigation.Phase 2: Enlargement of the hole via horizontal auger boring.